VGCA Pool opening May 28
A little video from Connor on the pool cover coming off. The pool is looking great and it was ready for swimming in 5 days of the cover being removed. Pool inspection is scheduled for May 12.
A little video from Connor on the pool cover coming off. The pool is looking great and it was ready for swimming in 5 days of the cover being removed. Pool inspection is scheduled for May 12.